Sichuan Huaqiao Phoenix Paper Co., Ltd. 400,000 tons of high-strength packaging paper expansion technology transformation project supporting PM6 paper machine thermal power plant equipment installation project
Supplier: Boiler
Main parameters:
Annual output: 400,000 tons
Paper: Wrapping paper
Boiler: 1× 90T/h, 2× 75T/h
Project scope: 1× 90T/h boiler auxiliary equipment and utility system installation; 1× 15MW back pressure turbine generator set and auxiliary equipment system installation; 2× 75T/h boiler supporting equipment and public system installation;
Completion Date: Estimated 2023.6